Dear SWILT-team,

I hope everybody is back from vacation and had a great time during summer :)

So, let's start in SWILT with our main September activities!

Please find attached the latest version of *D2.1 requirements and 
concept document (due 30.9.2019)*, version 0.9. As you can see, the 
document is quite extensive - but do not forget, this will be the most 
used document throughout the project! The current dissemination level of 
the document is confidential --> lots of data is important to us, but 
partially IFAT internal! Consider this also in all future publications 
--> re-check this with the consortium (as required by the consortium 
agreement).

_To conclude D2.1 there are several todos for each partner:_
(use the change-track option in Word, so we can reproduce your adaptions!)

*ALL*

  * put your open questions related to the requirments and WP3, WP4 and
    WP5 to section 4.8*
    *

*IFAT*, as document lead

  * 1. Executive summary - to be done
  * 2. Introduction - to be done
  * 8. Conclusion - to be done
  * check comments in section 3. Technical Overview
  * check comment in section 9. References
  * is it ok, if we also use ANNEX C in the document (Example route of a
    product)? --> please consider the confidentiality of the document!
  * check the entire section 4. Requirements analysis: please provide
    your feedback to us whether smth. is missing, needs to be adapted, etc.

*AAU*

  * please adapt subsection 5.1.7 Parameters for Simulation and fill the
    table: what kind of parameters (out of the once defined in 5.1
    Performance Metrics) you will probably use in which form
  * update section 5.2 Presentation of evaluation results --> it could
    make sense to join this section with 5.1.7

*NoX*

  * Update Section 7 Business Models

*LLabs*

  * Update section 4.8: some parts are still in DE
  * Update the "number" comments

Please, make your updates latest *until Monday, September 23*! This will 
allow us to form a final version and send it out for a quick final 
review process (as all of you now the main content already by today, 
this should be enough to reach the deadline on September 30).

Thank you very much and if you have any open questions, please let me 
know asap.

Best regards,

Melanie

-- 
Dipl.-Ing. Dr. Melanie Schranz
Senior Researcher
CPSwarm (cpswarm.eu, Horizon2020)
SWILT (swilt.aau.at, FFG)


Lakeside Labs GmbH
Lakeside B04b, 9020 Klagenfurt, Austria
P: +43 (0) 463 287 044 22
F: +43 (0) 463 287 04 410
E: schranz at lakeside-labs.com
W: melanieschranz.com

Geschäftsführung:

Mag. Claudia Prüggler
Univ.-Prof. Dr. Christian Bettstetter
Amtsgericht Klagenfurt, FN 306905g
www.lakeside-labs.com

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://lists.aau.at/pipermail/swilt/attachments/20190910/2348f7aa/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: SWILT D2.1 - requirements and concept document - v0.9.docx
Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document
Size: 1687525 bytes
Desc: not available
URL: <https://lists.aau.at/pipermail/swilt/attachments/20190910/2348f7aa/attachment-0001.docx>


More information about the SWILT mailing list